globalchange  > 气候变化与战略
DOI: 10.1016/j.est.2020.101272
论文题名:
Optimal investment timing and sizing for battery energy storage systems
作者: Kelly J.J.; Leahy P.G.
刊名: Journal of Energy Storage
ISSN: 2352152X
出版年: 2020
卷: 28
语种: 英语
英文关键词: Battery degradation ; Battery energy storage systems ; Deterministic Policy Gradient Algorithm ; Net Present Value ; Real Option Analysis ; Reinforcement learning ; Stochastic optimization
Scopus关键词: Battery storage ; Commerce ; Deregulation ; Electric batteries ; Global optimization ; Learning algorithms ; Learning systems ; Privatization ; Reinforcement learning ; Renewable energy resources ; Timing circuits ; Battery degradation ; Battery energy storage systems ; Net present value ; Policy gradient ; Real option analysis ; Stochastic optimizations ; Investments
英文摘要: Due to electricity market deregulation over the past two decades, the responsibility for new generation is with private investors who seek profit maximisation. Battery Energy Storage Systems (BESS), which are one solution to combat the intermittent nature of renewable energy sources, also require private investment for widespread deployment. This paper develops a methodology for applying Real Options Analysis to a BESS project from the perspective of private investors to determine the optimal investment time and BESS capacity size (MWh). Two models with different timescales are utilized: the operational model which is hourly, and the planning model which is yearly. The operational model is solved using a reinforcement learning algorithm called Deterministic Policy Gradient, while the planning model is solved using a MATLAB inbuilt nonlinear global optimiser called patternsearch. The methodology is demonstrated for a 100 MW BESS connected to the Irish grid and trading exclusively in the day-ahead market. Three different BESS CAPEX future realisations are analysed along with three different BESS manufacturers’ degradation warranties for C-Rates under 0.37C. The results show that BESS CAPEX has minimal influence on investment timing but has a significant effect on BESS size. Furthermore, extrapolating degradation warranty for C-Rates greater than 0.37C does not influence optimal investment timing or sizing, while a change in BESS energy retention limit at year 10 can have a significant influence on the viability of a BESS project. © 2020 Elsevier Ltd
Citation statistics:
资源类型: 期刊论文
标识符: http://119.78.100.158/handle/2HF3EXSE/158543
Appears in Collections:气候变化与战略

Files in This Item:

There are no files associated with this item.


作者单位: School of Engineering, University College CorkCork, Ireland; Marine & Renewable Energy Ireland Research Centre, University College Cork, Ireland; DP Energy Ireland Ltd, Mill House, Buttevant, Co. Cork, Ireland

Recommended Citation:
Kelly J.J.,Leahy P.G.. Optimal investment timing and sizing for battery energy storage systems[J]. Journal of Energy Storage,2020-01-01,28
Service
Recommend this item
Sava as my favorate item
Show this item's statistics
Export Endnote File
Google Scholar
Similar articles in Google Scholar
[Kelly J.J.]'s Articles
[Leahy P.G.]'s Articles
百度学术
Similar articles in Baidu Scholar
[Kelly J.J.]'s Articles
[Leahy P.G.]'s Articles
CSDL cross search
Similar articles in CSDL Cross Search
[Kelly J.J.]‘s Articles
[Leahy P.G.]‘s Articles
Related Copyright Policies
Null
收藏/分享
所有评论 (0)
暂无评论
 

Items in IR are protected by copyright, with all rights reserved, unless otherwise indicated.