globalchange  > 过去全球变化的重建
项目名称:
Abu Dhabi CCS Project (Phase 1 being Emirates Steel Industries (ESI) CCS Project)
承担单位: Abu Dhabi National Oil Company (ADNOC);Abu Dhabi Future Energy Company
资助来源: Global CCS Institute
国家: 澳大利亚
语种: 英语
英文摘要: The Abu Dhabi CCS Project involves the capture of CO2 from the Emirates Steel Factory in Abu Dhabi and its transportation to the ADNOC reservoirs for the purpose of enhanced oil recovery (EOR). The Project was conceived and will be managed by Al Reyadah: Abu Dhabi Carbon Capture Company, a Joint Venture between ADNOC, the UAE’s state-owned oil company, and Masdar, a wholly-owned subsidiary of the Abu Dhabi Government-owned Mubadala Development Company. The Masdar initiative was launched in 2006 to establish Abu Dhabi’s clean energy industry and this CCS Project, sourcing CO2 from ESI, is the first of a number of planned core components that would form an Abu Dhabi wide CCUS network. The source of CO2 for this Project, ESI, was established in 1998 and in 2001 it commenced manufacturing a range of industrial-purpose steel products. A two-stage expansion of the plant was completed in 2012, increasing its Direct Reduced Iron (DRI) capacity to 3.2 Mtpa. The DRI process employed at ESI produces a pure stream of CO2 (greater than 98 per cent) which is currently vented to atmosphere. The CO2 is captured using an amine based contactor / regenerator system. The CO2 capture rate from the DRI process is greater than 90 percent. The Project scope includes design and construction of a green field CO2 Compression Facility (CCF) including dehydration, to be located within ESNAAD (an ADNOC Group company), adjacent to the ESI Factory in Mussafah, Abu Dhabi. CO2 is transferred at low pressure to the CCF where it is dehydrated (to less than 20lb/MMscf), compressed to 235barg (via an Integrally Geared LP Compression followed by Reciprocating HP Compression), metered and exported to the CO2 Pipeline. The CCF design capacity is 0.8 MMTPA. The CO2 is transported 43 km / 27 miles through an eight inch pipeline for injection into ADNOC reservoirs for EOR purposes. Development planning and operations for these fields rests with ADNOC operating companies. In 2009-2011 Masdar and ADCO (an ADNOC group OPCO) undertook a pilot project involving the injection of approximately 60 tonnes of CO2 per day into the ADNOC Rumaitha oilfield. The pilot project included three wells – a CO2 injection well, an observation well and an oil producing well. The pilot provided information on the amounts of CO2 required for injection and the potential volume of oil recoverable. In November 2013 ADNOC and Masdar formalised the joint venture agreement and awarded the Dodsal Engineering and Construction Group with a Dh450 million (US$122.5 million) EPC contract to build the CO2 dehydration and compression facility and the 43 km / 27 mile pipeline to Rumaitha.
URL: http://www.globalccsinstitute.com/projects/abu-dhabi-ccs-project-phase-1-being-emirates-steel-industries-esi-ccs-project
资源类型: 项目
标识符: http://119.78.100.158/handle/2HF3EXSE/236
Appears in Collections:过去全球变化的重建

Files in This Item:

There are no files associated with this item.


Recommended Citation:
. Abu Dhabi CCS Project (Phase 1 being Emirates Steel Industries (ESI) CCS Project).
Service
Recommend this item
Sava as my favorate item
Show this item's statistics
Export Endnote File
Google Scholar
Similar articles in Google Scholar
百度学术
Similar articles in Baidu Scholar
CSDL cross search
Similar articles in CSDL Cross Search
Related Copyright Policies
Null
收藏/分享
所有评论 (0)
暂无评论
 

Items in IR are protected by copyright, with all rights reserved, unless otherwise indicated.