globalchange

Search Results

Help

Item hits: (Results 1-4 of 4)

Items/Page:    Sort:
Extending Depot Length and Intervals for DDG-51-Class Ships: Examining the 72-Month Operational Cycle [研究报告]
10.7249/RR1235RAND Corporation. 2016-01-01
Roland J. Yardley;  Daniel Tremblay;  Brian Perkinson;  Brenna Allen;  Abraham Tidwell;  Jerry M. Sollinger
Adobe PDF(1142Kb)  |  View/Download:43/9
 
Extending Depot Length and Intervals for DDG-51-Class Ships: Examining the 72-Month Operational Cycle [研究报告]
10.7249/RR1235RAND Corporation. 2016-01-01
Roland J. Yardley;  Daniel Tremblay;  Brian Perkinson;  Brenna Allen;  Abraham Tidwell;  Jerry M. Sollinger
Adobe PDF(1142Kb)  |  View/Download:38/8
 
Designing Adaptable Ships: Modularity and Flexibility in Future Ship Designs [研究报告]
10.7249/RR696RAND Corporation. 2016-01-01
John F. Schank;  Scott Savitz;  Ken Munson;  Brian Perkinson;  James McGee;  Jerry M. Sollinger
Adobe PDF(1378Kb)  |  View/Download:44/4
 
Designing Adaptable Ships: Modularity and Flexibility in Future Ship Designs [研究报告]
10.7249/RR696RAND Corporation. 2016-01-01
John F. Schank;  Scott Savitz;  Ken Munson;  Brian Perkinson;  James McGee;  Jerry M. Sollinger
Adobe PDF(1378Kb)  |  View/Download:46/11
 

1